Superfund Site:

BECKMAN INSTRUMENTS (PORTERVILLE PLANT)
PORTERVILLE, CA

Superfund Site Profile

Site Contacts

Community Involvement Coordinator
David Yogi
(415) 972-3350

Remedial Project Manager
Holly Hadlock
(415) 972-3171

Site Location

Street Address:
167 W POPLAR AVE
PORTERVILLE, CA 93257

Sign up for this Superfund site’s mailing list

Announcements and Key Topics

EPA DELETED THE BECKMAN INSTRUMENTS SITE FROM SUPERFUND LIST

On March 22, 2022, EPA deleted the Beckman Instruments site in Porterville, California, from EPA’s list of Superfund sites. The soil and groundwater cleanup was completed and no contaminants from the former Beckman electronics plant remain in soil or groundwater at levels that pose a risk to human health or the environment.

Background

The 12-acre former Beckman Instruments plant was located at 167 West Poplar Avenue in Porterville, California. The plant was shut down in 2017.

Beckman Instruments, now operating as Beckman Coulter, Inc. ...